Kenya

Mavoko Drinking Water Supply Project

(2017-02-01 - 2020-08-31)

Construction of a new Drinking Water Treatment Plant and two River Intakes

 

KMC Dam:

  •  - Procurement and installation of 2 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves.
  •  - Construction of the new pump station.
  •  - Procurement and laying of a 6.2 km HDPE OD 400 raw water main from the intake towards the new water treatment plant.
  •  - Installation of a step-down transformer (11/0.40 kV, 315 kVA).
  •  - Rehabilitation and cleaning of the existing dam.

 

EAPCC Dam:

  •  - Procurement and installation of 1 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves.
  •  - Rehabilitation of the pump room.
  •  - Procurement and laying of a 3.6 km of HDPE OD 250 raw water main for the raw water backup towards the new water treatment plant.
  •  - Procurement and installation of a new step-down transformer (11/0.40 kV, 200 kVA).
  •  - Rehabilitation and cleaning of the existing dam.

 

New Water Treatment Plant:

  •  - Construction of a 12,000 m³/day drinking water treatment plant, conventional process:
    • Coagulation/flocculation;
    • Sedimentation;
    • Filtration;
    • Disinfection (chlorination);
    • pH correction of the treated water.
  •  - Procurement and installation of the electromechanical equipment:
    • Piping;
    • Valves;
    • Electrical control panels;
    • Dosing equipment and for the preparation of the reagents;
    • Instrumentation;
    • Laboratory equipment.
  •  - Construction of a 5,000 m³ reinforced concrete ground reservoir incl. procurement and installation of valves and ancillary equipment.
  •  - Procurement and installation of 1 + 1 pumps (150 m³/h at 75 m), electrical panels, valves, piping and rehabilitation of the pump room (pumping towards Daystar University);
  •  - Installation of a step-down transformer (11/0.40 kV, 315 kVA).

 

Extension and Densification of the Drinking Water Supply Coming From Nairobi and Nol-Turesh

 

Nairobi - Syokimau pipeline:

  •  - Procurement and laying of a 10.6km HDPE OD 400 from Nairobi to Syokimau to improve the drinking water supply coming from the capital.
  •  - Construction of a 4,000m³ storage reservoir downstream this new pipeline.
  •  - Procurement and installation of valves and ancillary equipment in this new reservoir.
  •  - Procurement and construction of a 300m³ steel elevated tank to enable the supply of drinking water in the elevated zone of Syokimau.
  •  - Procurement and installation of 1 + 1 pumps (200 m³/h at 25 m), electrical panels, piping, and valves.
  •  - Construction a small pump room.

 

Nol-Turesh pipeline:

  •  - Rehabilitation of the Salama pumping station.
  •  - Procurement and installation/replacement of 3 new pumps (180 m³/h at 373 m).
  •  - Procurement and installation/replacement of the electrical panels.
  •  - Procurement of spare parts and servicing of recently installed pump (180 m³/h at 373m).
  •  - Rehabilitation of the generator (1,825 kVA).
  •  - Procurement and installation of the equipment along the pipeline.
  •  - Refurbishment of the storage reservoir upstream to the pipe.